M. Aderholz (MPI), K. Amako (KEK), E. Arderiu Ribera (CERN), E. Auge (L.A.L/Orsay), G. Bagliesi (Pisa/INFN), L. Barone (Roma1/INFN), G. Battistoni (Milano/INFN), M. Bernardi (CINECA), G. Boschini (CILEA), A. Brunengo (Genova/INFN) J. Bunn (Caltech/CERN), J. Butler (FNAL), M. Campanella (Milano/INFN), P. Capiluppi (Bologna/INFN), M. D'Amato (Bari/INFN), M. Dameri (Genova/INFN), A. di Mattia (Roma1/INFN), G. Erbacci (CINECA), U. Gasparini (Padova/INFN), F. Gagliardi (CERN), I. Gaines (FNAL), P. Galvez (Caltech), A. Ghiselli (CNAF/INFN), J. Gordon (RAL), C. Grandi (Bologna/INFN), F. Harris (Oxford/CERN), K. Holtman (CERN), V. Karim�ki (Helsinki), Y. Karita (KEK), J. Klem (Helsinki), I. Legrand (Caltech/CERN), M. Leltchouk (Columbia), D. Linglin (IN2P3/Lyon Computing Centre), P. Lubrano (Perugia/INFN), L. Luminari (Roma1/INFN), A. Maslennicov (CASPUR), A. Mattasoglio (CILEA), M. Michelotto (Padova/INFN), I. McArthur (Oxford), Y. Morita (KEK), A. Nazarenko (Tufts), H. Newman (Caltech), V. O'Dell (FNAL), S.W. O'Neale (Birmingham/CERN), B. Osculati (Genova/INFN), M. Pepe (Perugia/INFN), L. Perini (Milano/INFN), J. Pinfold (Alberta), R. Pordes (FNAL), F. Prelz (Milano/INFN), S. Resconi (Milano/INFN and CILEA), L. Robertson (CERN), S. Rolli (Tufts), T. Sasaki (KEK), H. Sato (KEK), L. Servoli (Perugia/INFN), R.D. Schaffer (Orsay), M. Sgaravatto (Padova/INFN), T. Schalk (BaBar), J. Shiers (CERN), L. Silvestris (Bari/INFN), G.P. Siroli (Bologna/INFN), K. Sliwa (Tufts), T. Smith (CERN), D. Ugolotti (Bologna/INFN), E. Valente (INFN), C. Vistoli (CNAF/INFN), I. Willers (CERN), R. Wilkinson (Caltech), D.O. Williams (CERN).
14th June 1999 [Editor holding token: Bunn]
The MONARC Project is well on the way towards its primary goals of identifying baseline Computing Models that could provide viable (and cost-effective) solutions to meet the data analysis needs of the LHC experiments, providing a simulation toolset that will enable further Model studies, and providing guidelines for the configuration and services of Regional Centres. The criteria governing the MONARC work are:
The main deliverable from the project is a set of example "baseline" Models. The project aims at helping to define regional centre architectures and functionality, the physics analysis process for the LHC experiments, and guidelines for retaining feasibility over the course of running. The results will be made available in time for the LHC Computing Progress Reports, and could be refined for use in the Experiments' Computing Technical Design Reports by 2002.
The approach taken in the Project is to develop and execute discrete event simulations of the various candidate distributed computing systems. The granularity of the simulations is adjusted according to the detail required from the results. The models are iteratively tuned in the light of experience. The model building procedure, which is now underway, relies on simulations of the diverse tasks that are part of the spectrum of computing in HEP. A simulation and modelling tool kit is being developed, to enable studies of the impact of network, computing and data handling limitations on the models, and to test strategies for an efficient data analysis in the presence of these limitations.
The scale, complexity and worldwide geographical spread of the LHC computing and data analysis problems are unprecedented in scientific research. Each LHC experiment foresees a recorded raw data rate of 1 PetaByte/year (or 100 MBytes/sec during running) at the start of LHC operation. This rate of data to storage follows online filtering by a factor of several hundred thousand, and online processing and data compaction, so that the information content of the LHC data stores will far exceed that of the largest PetaByte-scale digital libraries foreseen for the next 10-15 years. As the LHC program progresses, it is expected that the combined raw and processed data of the experiments will approach 100 PetaBytes by approximately 2010. The complexity of processing and accessing this data is increased substantially by the size and global span of each of the major experiments, combined with the limited wide area network bandwidths that are likely to be available by the start of LHC data taking.
The general concept developed by the two largest experiments, CMS and ATLAS, is a hierarchy of distributed Regional Centres working in close coordination with the main centre at CERN. The regional centre concept is deemed to best satisfy the multifaceted balance needed between
The use of regional centres is well matched to the worldwide-distributed structure of the collaboration, and will facilitate access to the data through the use of national and regional networks of greater capacity than may be available on intercontinental links.
The MONARC project is the means by which the experiments have banded together to meet the technical challenges posed by the storage, access and computing requirements of LHC data analysis. The baseline resource requirements for the facilities and components of the networked hierarchy of centres, and the means and ways of working by which the experiments may best use these facilities to meet their data-processing and physics-analysis needs, are the focus of study by MONARC.
The primary goals of MONARC are to:
In order to achieve these goals MONARC has organised itself into four working groups, and is led by a Steering Group responsible for directing the project and coordinating the Working Group activities. Members of the Steering Group are given below:
Steering Group Member | Principal Activity |
---|---|
Harvey Newman (Caltech) | Spokesperson |
Laura Perini (INFN Milano) | Project Leader |
Krzysztof Sliwa (Tufts) | Simulation and Modelling WG Leader |
Joel Butler (Fermilab) | Site and Network Architectures WG Leader |
Paolo Capiluppi (INFN Bologna) | Analysis Process Design WG Leader |
Lamberto Luminari (INFN Roma) | Testbeds WG Leader |
Les Robertson (CERN IT) | CERN Centre Representative |
David O. Williams (CERN IT) | Network Evolution and Costs |
Frank Harris (Oxford/CERN) | LHCb Representative |
Luciano Barone (INFN Roma) | Distributed Regional Centres |
Jamie Shiers (CERN IT) | RD45 Contact |
Denis Linglin (CCIN2P3 Lyon) | France RC Representative |
John Gordon (RAL) | United Kingdom RC Representative |
Youhei Morita (KEK) | Objectivity WAN (KEK) |
A Regional Centres Committee has been formed, composed of representatives of actual and potential regional centres; which acts as an extended MONARC Steering Group.
The progress of each of the Working Groups is summarised in the following chapters of this report.
As scheduled in the PEP, the MONARC Simulation WG (Chapter 2) has developed a flexible and extensible set of common modelling and simulation tools. These tools are based on Java, which allows the process-based simulation system to be modular, easily extensible, efficient (through the use of multi-threading) and compatible with most computing platforms. The system is implemented with a powerful and intuitive Web-based graphical user interface that will enable MONARC, and later the LHC experiments themselves, to realistically evaluate and optimise their physics analysis procedures.
The Site and Networks Architectures WG (Chapter 3) has studied the computing, data handling and I/O requirements for the CERN centre and the main "Tier1" Regional Centres, as well as the functional characteristics and wide range of services required at a Tier1 Centre. A comparison of the LHC needs with those of currently running (or recently completed) major experiments has shown that the LHC requirements are on a new scale, such that worldwide coordination to meet the overall resource needs will be required. Valuable lessons have been learned from a study of early estimates of computing needs during the years leading up to the "LEP era". A study of the requirements and modes of operation for the data analysis of major experiments just coming (or soon to come) into operation has been started by this group. The group is also beginning to develop conceptual designs and drawings for candidate site architectures, in cooperation with the MONARC Regional and CERN Centre representatives.
The Analysis Process Design WG (Chapter 4) has studied a range of initial models of the analysis process. This has provided valuable input both to the Architectures and Simulation WG's. As the models and simulations being conducted became more complex, close discussions and joint meetings of the Analysis Process and Simulation WG's began, and will continue. In the future, this group will be responsible for determining some of the key parameter sets (such as priority-profiles and breakpoints for re-computation versus data transport decisions) that will govern some of the large scale behaviour of the overall distributed system.
The Testbeds WG (Chapter 5) has defined the scope and a common (minimum) configuration for the testbeds with which key parameters in the Computing Models are being studied. The recommended test environment including support for C++, Java, and Objectivity Version 5 has been deployed on Sun Solaris as well as Windows NT and Linux systems. A variety of tests with 4 sets of applications from ATLAS and CMS (including the GIOD project) have begun. These studies are being used to validate the simulation toolset as well as extracting key information on Objectivity performance.
Distributed databases are a crucial aspect of these studies. Members of MONARC also lead or participate in the RD45 and GIOD projects which have developed considerable expertise in the field of Object Database Management Systems (ODBMS). The understanding and simulation of these systems by MONARC have benefited from the cooperation with these projects.
Chapter 6 of this report summarises the workplan and schedule, from now to the end of Phase 2. This chapter also introduces a possible Phase 3 of MONARC which would define and study an optimised integrated distributed system aimed at using the available resources most efficiently, and discusses the relative scope and timing of Phase 2 and 3. The status of the milestones presented in the PEP is reviewed, and more specific milestones are set for the upcoming stage of the project. The status of MONARC's relations to the other projects mentioned in the PEP also is briefly reviewed.
Finally, Chapter 7 presents an overview of the system optimisation issues, and of current or upcoming projects addressing them. Such issues will be the core of the Phase 3 R&D studies. These ideas will be discussed in MONARC within the next few months, in order to formulate a proposal for a PEP extension, to be presented towards the end of 1999.
The development of a powerful and flexible simulation and modelling framework for the distributed computing systems was the most important task in the first stage of the project. Some requirements for the framework are listed below:
The distributed nature of the reconstruction and analysis processes for the LHC experiments required the framework's simulation program capable of describing complex patterns of data analysis programs running in a distributed computing system. It was recognised from the very beginning that a process-oriented approach for discrete event simulation is well suited to describe a large number of programs running concurrently, all competing for limited resources (data, CPU, memory, network bandwidth etc.).
A broad survey of existing tools (SoDA[26], ModNet[27], Ptolemy[28],
SES[29], PARASOL[30]), led to a realisation that Java technology provides well developed
and certainly adequate tools for developing a flexible and distributed, process-oriented,
simulation that would meet the requirements. Java has built-in multi-thread support for
concurrent processing, which is an advantage for simulation purposes provided that a
dedicated scheduler is developed. Although initially it was thought that the SoDA package
developed by C. von Praun at CERN could provide the basis of the tool, it was decided that
a considerably more flexible and extensible process-oriented discrete event simulation
program could be constructed using readily available Java classes and libraries.
[Ed. I have tried to reorganise this, and the next, section in an attempt to make the distinction between the two versions of the program, and the two first models that were simulated. It still needs work ...]
In February '99 a first version of the simulation program was written quickly (in about one week) by I. Legrand using JDK 1.1. This provided a proof of concept, and a decision was made to continue development in Java. To test the program, a simulation of CERN's CS2 farm was chosen. This parallel computer system is used for data acquisition (DAQ) and processing at CERN. The elements of the simulation program were the variable numbers of DAQ nodes (senders), disk server nodes (writers) and data processing nodes which were connected via a LAN switch. In addition, the DAQ message size, event size, processing time and the sender's time, together with the numbers of various nodes were used as input parameters.
The CS2 farm model was built of passive objects like TAPE, CPU and DISK interacting via "active objects". The program was a process oriented distributed event simulation based on "active objects" (JOBS and LINKS). Each active object ran concurrently within the simulation program with multi-threading, to "perform" a set of actions which were pre-defined by the user. Each action was defined to have a certain amount of response time, calculated from available shared system resources at the time. If an object was activated or deactivated in the system, an interrupt was signalled to all other active objects, and the response time for the on-going task on each object was re-calculated. The simulation then continued with the re-calculated response time.
The simulation was checked by executing single threads and monitoring
virtually every transaction at the most elementary level. Additionally, multi-threaded
systems were run in such a way that a comparison of the results could be made with
analytical calculations (i.e. by disabling pseudo-random behaviour of the model). The
simulation outputs were the total load on the switch (MB/s) and the CPU usage (% of
available). These were measured as a function of variable numbers of DAQ, processing and
data server nodes, as well as the varying processing time and the message size. The
analytically predicted behaviour of the CS2 system (saturation of CPU or the network
bandwidth, depending on the chosen set of parameters) was fully reproduced in the
simulation. Figure 1 shows the simulation tool in use for the CS2 simulation. Figures 2
and 3 show the simulation results as viewed in the tool GUI.
Figure 1: Showing the simulation tool GUI and a schematic of the tool's operation.
Figure 2: Showing the CPU and I/O usage predicted by the simulation tool for the operation of the CS2
Figure 3: Showing a breakdown of the simulated CS2 task activities as a function of time
After work on implementation had begun, it was soon realised that the Data Model had to be realistically described in the simulation program to allow for a realistic mapping of the behaviour of an object database. As envisaged in the Computing Proposals of the LHC experiments, all data is organised in objects and managed within the framework of an object database. In our case we consider specifically an Objectivity/DB federated database, which allows to distribute sets of objects onto different media, geographically and physically, media (tape, disk...) and data servers (Objectivity AMS servers), while maintaining a coherent and logically uniform view of the entire distributed database. Objects can contain pointers to each other (associations) which enable navigation across the entire database. The data model implemented in the simulation consists of 4 functionally different groups of objects:
Data of these four different types are organised in unique containers (files). The simulation has a software equivalent of a real Objectivity/DB database catalogue, which allows each job to identify which containers are needed for processing the data requested by that JOB. The locking mechanism has been implemented on the container level, as in Objectivity federated databases. Different types of operation on the data are modelled by different JOBS; for example RAW->ESD, ESD->AOD and AOD->TAG processing involves different input and output data, and different processing time. For example, if the initial FARM configuration has all data on TAPE, if RAW->ESD jobs are submitted to the queues, they invoke the TAPE->DISK copy process.
The simulation was checked by executing single threads and monitoring virtually every transaction at the most elementary level. Additionally, multi-threaded systems were run in such a way that a comparison of the results could be made with analytical calculations (i.e. by disabling pseudo-random behaviour of the model).
The first version of the program had the passive objects, TAPE, DISK, CPU as generic entities. No realistic configuration was provided, i.e. all DISK was being accessed as if they were part of the same, single, disk server. Discussion on how to implement realistic descriptions of TAPE, DISK, CPU and NETWORK, led to a conceptual design of a second version of the simulation program at the end of February 1999. By implementing the interactions between the different AMS servers (Objectivity disk servers) one could easily built a model with multiple regional centres. Figure 4 shows the simlution components of a model of a Regional Centre.
Figure 4: Showing the components of the simulated Regional Centre
The second version of the Legrand simulation program was available for testing at the end of April 1999. It constitutes a major revision of the previous tool, providing an improved description of the Database Model, including multiple AMS servers, each with a finite amount of DISK connected to them. Figure 5 shows the structure of the model used to simulate the Objectivity database system.
Figure 5: Showing how the Objectivity database is modelled using the
simulation tool.
The new scheme provides for an efficient way to handle a
very large number of objects and automatic storage management, allows one to emulate
different clustering schemes of the data for different types of data access patterns as
well as to simulate the order of access following the associations between the data
objects, even if the objects reside in databases in different AMS servers.The NETWORK
model has been modified as well. It is, at present, an "interrupt" driven
simulation. For each new message an interrupt is created, which triggers a re-calculation
of the transfer speed and the estimated time to complete a transfer for all the active
objects. Such a scheme provides an efficient and realistic way to describe (simulate)
concurrent transfers using very different object sizes and protocols. Logically, there is
no difference in the way LANs and WANs are simulated. A multi-tasking processing model for
shared resources (CPU, Memory, I/O channels) has been implemented. It provides an
efficient mechanism to simulate multitasking and I/O sharing. It offers a simple mechanism
to apply different load balancing schemes. With the new program it is now possible to
build a wide range of computing models, from the very centralised (with reconstruction and
most analyses at CERN) to the distributed systems, with an almost arbitrary level of
complication (CERN and multiple regional centres, each with different hardware
configuration and possibly different sets of data replicated). A much improved GUI,
enhanced graphical functions and built-in tools to analyse results of the simulations are
also provided. Table 2 shows a list of parameters currently in use
by the MONARC simulation tool.
federated database and data model parameters (global) | regional centre configuration parameters (local) |
---|---|
database page size | number of AMS_servers |
TAG object size/event | AMS link speed |
AOD object size/event | AMS disk size |
ESD object size/event | number of processing nodes |
RAW object size/event | CPU/node |
processing time RAW->ESD | memory/node |
processing time ESD->AOD | node link speed |
processing time AOD->TAG | mass storage size (in HSM) |
analysis time TAG | link speed to HSM |
analysis time AOD | AMS write speed |
analysis time ESD | AMS read speed |
memory for RAW->ESD processing job | (maximum disk read/write speed) |
memory for ESD->AOD processing job | |
memory for AOD->TAG processing job | data access pattern parameters (local) |
memory for TAG analysis job | fraction of events for which TAG->AOD associations are followed |
memory for AOD analysis job | |
memory for ESD analysis job | fraction of events for which AOD->ESD associations are followed |
container size RAW | |
container size ESD | fraction of events for which ESD->RAW associations are followed |
container size AOD | |
container size TAG | clustering density parameter |
A number of parameters can be modified easily using the GUI menus, they include most of the global parameters describing the analysis (CPU needed by various JOBS, as well as memory required for processing) and most of local parameters defining the hardware and network configuration of each of the regional centres which are part of the model (an arbitrary number of regional centres can be simulated, each with different configuration and with different data residing on it). Also, the basic hardware costs can be input via GUI, which allows simple estimates of the overall cost of a system. This part of the simulation program will certainly evolve to include the price for items which are more difficult to quantify, like inconvenience and discomfort, travel costs et cetera. For each regional centre, one can define a different set of jobs to be run. In particular, one could define different data access patterns in physics analyses performed in each of the centres, with different frequencies of following the TAG->AOD, AOD->ESD and ESD->RAW associations. Figure 6 shows the simulation tool GUI for building a model.
Figure 6: Showing the simulation tool GUI for building a model
Appendix A describes other example models built with the
simulation tool.
The next step, which has already started, is to perform validation of the current version of the simulation program and its logical model. Behaviours of the simple CS2 model, and that of a single FARM, have been verified as described in Section 2.3. Similar tests were also performed, although not yet fully, with the second version of the MONARC simulation program.
It was realised early in January, 1999, that it will be difficult to compare the simulation results with many of the existing experiments because our knowledge of their computing systems, however detailed, is inadequate to extract a proper "modelling" of the key parameters required for the simulation. The validation of the simulation program should be done by actually measuring the performance of the system with varying job stress and data access patterns. The precision of the simulation can only be increased by the iteration of refining the model of the system and the parameters with the actual measurements with dedicated test-sites.
What is needed is the measurements of the key parameters of the distributed database such as AMS read/write speeds with a single user and also with stress tests. A close discussion between the Analysis WG and Testbed WG has begun, to identify the key parameters and the dependencies of the parameters needed in the simulation program.
We also need to validate the correctness of the scaling behaviour, which
is vital in making any predictions on a large scale distributed system. Another set of the
needed measurements concerns the local and the wide area network parametrisation function.
With those parameters in hand, and assuming that no significant changes to the logical
model of the program will be required, the present simulation program provides a tool with
which one can perform complex and meaningful studies of the architectures of the LHC-era
computing systems.
In the process-oriented approach, response time function of the passive objects such as TAPE, DISK, CPU, NETWORK and AMS will define the precision and granularity of the simulation. Among others, the behaviour of AMS and NETWORK objects are of particular interest in view of MONARC project. The response time function of AMS in fact depends on the various internal Objectivity/DB parameters such as the object size, object clustering and page size, as well as "use-case" parameters such as data modelling, mirroring, caching, and data access patterns. A stress test of multiple user jobs with respect to a single user job performance is also important in predicting the scalability of the system. A preliminary measurement has began in the Testbed WG with a local federated database with a single AMS server (Chapter 5). A function or functions of characterising the network performance should also be measured.
Different analysis access patterns, using data organised with different size objects and with different frequencies of following the TAG->AOD, AOD->ESD and ESD->RAW associations, will be used to test the more complex behaviours of the distributed systems, and compared with to validate the predictions of the simulation program. Also, measurements of identical access patterns, but using multiple AMS servers connected with different network bandwidths are foreseen.
Finding the key parameters and the key dependencies and the scaling
between those parameters in various models of distributed computing system will constitute
a significant step towards validation of the second-round models of the LHC-era
experiments. It has been planned that this stage will take place in the summer of 1999,
and the project seems very much on track to meet that milestone.
Some minor additions to the program are foreseen in the short term: Database replication protocol has to be implemented, and adding a possibility of physicists analysing data using the CPU available at their workstations rather than CPU at the Regional Centres. An important area of work in the next stage will be the development of an analysis framework, a software system which would allow systematic exploring of the multi-dimensional space of input parameters describing the LHC experiments computing systems architecture and evaluate its performance.
It is important to mention some key elements that go into the system design, apart from the performance parameters of the components.
Obviously not all of the above need be implemented at once, but a realistic model used optimally will include "stress" (full utilisation and some over-subscription) of the components. Hence some of the above elements will have to be taken into account, and a rough time-schedule for the implementation of these and perhaps other key aspects of a "realistic model" should be given, so that we can demonstrate that there are certain "baseline" (minimum) resource requirements.
All milestones have been met, except for that which calls for
"validation of the chosen tools with the Model taken from an existing
experiment" in January 1999. It was realised that it will be difficult to compare
simulation results with many of the existing experiments because our detailed knowledge of
their computing systems, and more importantly the measurement of performance and
throughput, is inadequate. The basic elements of the logical model and the applicability
of Java tools have been verified with the CS2 model, although that system was certainly
much simpler than any of the two example models (Reconstruction and Physics Analysis)
which have been built with the second version of the simulation tools. We are currently of
the opinion that the validation of the MONARC simulation program would be most reliably
done by verifying the results of complicated access patterns with the measurements
performed on dedicated test-sites, as described in section 2.5.
All existing information, including various presentations in which the logical model of the MONARC simulation tool has been has presented, some documentation, simple examples and demos are available on from MONARC WWW pages (MONARC->Simulation and Modelling->Status of the Simulation Software):
The two example models built with the second version of the MONARC simulation tool are available from sunitp01.cern.ch/Examples. There exists a group account on that machine, and any MONARC member can either copy the files and run the programs on a local workstation with JDK1.2 installed, or one can run the program on sunitp01.cern.ch using an X-window server. A MONARC collaboration-wide working environment will be prepared shortly on a SUN workstation at CERN (monarc01.cern.ch) to allow participatio of more people in developing and validating the program.
It is anticipated that significant improvements to the program
documentation will be made during the Summer of 1999.
The task of the Architecture Working Group is to develop distributed
computing system architectures for LHC which can be modelled to verify their performance
and viability. To carry out this task, the group considered the LHC analysis problem in
the "large". We started with the general parameters of an LHC experiment, such
as
From there we conducted detailed discussions about how the analysis task will be
divided up between the computing facility at CERN and computing facilities located outside
of CERN. We considered what kind of facilities will be viable given different analysis
approaches and networking scenarios, what kind of issues each type of facility will face,
and what kind of support will be required to sustain the facility and make it an effective
contributor to LHC computing.
The viability of a given site architecture will ultimately be judged
according to its ability to deliver a cost-effective solution to the LHC computing
problem. Factors contributing to the viability (and the relative effectiveness) of a given
architecture include
The judgement of the viability of a given architecture must be done in combination with
a well-chosen "analysis strategy" that specifies the profile of, and limitations
on, the users' analysis tasks, the partitioning of resources among the
production-oriented, group-oriented and individuals' activities in the data analysis
process, and the parameters controlling such decisions as recomputation or inter-site
transport of portions of the data.
Once a set of viable architectures has been determined, the relative effectiveness of different implementations will need to be determined according to the minimum requirements for turnaround, system MTBF, and the maximum allowable cost, as determined by the LHC experiments and the host-organisations at the sites. As indicated above, the evaluation of a system's effectiveness must be performed in combination with an intelligent strategy that aims at optimal use.
The general picture that has emerged from these discussions is:
The primary motivation for a hierarchical collection of computing resources, called Regional Centres, is to maximise the intellectual contribution of physicists all over the world, without requiring their physical presence at CERN. An architecture based on RCs allows an organisation of computing tasks which may take advantage of physicists no matter where they are located. Next, the computing architecture based on RCs is an acknowledgement of the facts of life about network bandwidths and costs. Short distance networks will always be cheaper and higher bandwidth than long distance (especially intercontinental) networks. A hierarchy of centres with associated data storage ensures that network realities will not interfere with physics analysis. Finally, RCs provide a way to utilise the expertise and resources residing in computing centres throughout the world. For a variety of reasons it is difficult to concentrate resources (not only hardware but, more importantly, personnel and support resources) in a single location. A RC architecture will provide greater total computing resources for the experiments by allowing flexibility in how these resources are configured and located. A corollary of these motivations is that the RC model allows one to optimise the efficiency of data delivery/access by making appropriate decisions on processing the data. One important motivation for having such 'large' Tier1 RCs is to have centres with a critical mass of support people while not proliferating centres which would then create an enormous coordination problem for CERN and the collaborations.
There are many issues with regard to this approach. Perhaps the most important involves the coordination of the various Tiers. While the group has a rough understanding of the scale and role of the CERN centre and the Tier1 RCs, whether we need Tier2 centres and special purpose centres and what their roles should be has been worked on a little and is much less clear. Which types of centres should be created in addition to Tier1 centres and what their relationship to CERN, the Tier1 centres, and to each other should be will be a major subject of investigation over the next few months. Also, there are a variety of approaches to actually implementing a Tier1 centre. Regional centres may serve one or more than one collaboration and each arrangement has its advantages and disadvantages.
There are also a number of higher-level issues that are complex, and heavily dependent on the evolution of system and system-software concepts, in addition to the technology evolution of components. It is likely that by LHC startup, efficient use of the hierarchy of centres will involve their use, to some extent, as if they were a single networked system serving a widely distributed set of users. From the individual site's point of view, this "one-distributed-system" concept will have to be integrated with, or traded off against, the fact that the site will be serving more than the LHC program, and often more than one LHC experiment.
To keep its discussions well grounded in reality, the group has
undertaken the following tasks, which are described in the MONARC Project Execution Plan
(PEP):
Items 1 and 2 help us develop models to input to the Simulation and Testbed Working
groups. Item 3 is essential to ensure that the proposed models of distributed computing
are "real" in the sense that they are compatible with the views of likely Tier1
RC sites. Items 4 and 5 keep model building within the boundaries of available technology
and funding.
This year, the Architecture Working Group has produced three documents
that have been submitted to the full collaboration and are summarised below. The plans for
a fourth document are presented.
This survey included:
The main conclusion from this report is that the LHC experiments are at such a
different scale from the surveyed experiments and that technology has changed so much
since some of them ran, that LHC experiments will need a new model of computing. We can,
however, derive valuable lessons on individual topics and themes.
Some of the most important lessons on the computing architectures were:
This document was prepared by Les Robertson of CERN IT Division. It attempts to summarise a rough estimate of the capacities needed for the analysis of an LHC experiment and to derive from them the size of the CERN central facility and a Tier1 Regional Centre. The information has been obtained from estimates by CMS and cross checked with ATLAS and with the MONARC Analysis Working group. Some adjustments have been made to the numbers obtained from the experiments to account for overheads that are now measured but were not when the original estimates were made. While the result has not yet been reviewed by CERN management, it currently serves as our best indication of thinking on this topic at CERN so we are using it as the basis for proceeding.
Current studies of the full simulation and reconstruction of events at full LHC luminosity tend to indicate that the requirements estimates in this report are not overestimates, and additional work may be required to reduce the computing time per event to these target levels. The report also does not take into account the needs for full simulation and reconstruction of simulated events, which must be processed, stored and accessed at Regional Centres or at local institutes, if not at CERN.
It is assumed that CERN will NOT be able to provide more than about about 1/2 of the aggregate computing need for data recording, reconstruction, and analysis of LHC experiments. This is exclusive of Monte Carlo event simulation and reconstruction of simulated events. The remainder must come from elsewhere. The view expressed by the author is that it must come from a 'small' number of Tier1 Regional Centres so that the problems of maintaining coherence and coordinating all the activities is not overwhelming. This sets the size of Tier1 RCs at 10-20% of the CERN centre in capacity.
Table 3 summarises the total CPU, disk, LAN throughput, tapes, tape I/O, and the number of 'boxes' that will have to be operated to support the data analysis of a large LHC experiment as the LHC moves from turn on around 2005 to full luminosity operation a few years later.
year |
2004 |
2005 |
2006 |
2007 |
total cpu (SI95) | 70'000 |
350'000 |
520'000 |
700'000 |
disks (TB) | 40 |
340 |
540 |
740 |
LAN thr-put (GB/sec) | 6 |
31 |
46 |
61 |
tapes (PB) | 0.2 |
1 |
3 |
5 |
tape I/O (GB/sec) | 0.2 |
0.3 |
0.5 |
0.5 |
approx box count | 250 |
900 |
1400 |
1900 |
Based on Les Robertson's estimates and the issues raised about the problems with distributed computing in the past by the survey Computing Architectures of Existing Experiments, we developed a framework for discussing Regional Centres and produced a document which gives a profile of a Tier1 Regional Centre.
This profile is based on facilities (and the corresponding capacities) and services (capabilities) which need to be provided to users. There is a clear emphasis on data access by users since this is seen as one of the largest challenges for LHC computing, especially where parts of the data may be located at remote sites, and/or resident in a tape-storage system.
It is important to recognise that MONARC cannot and does not want to try to dictate the implementations of the Regional Centre architecture. That is best left to the collaborations, the candidate sites, and to CERN to work out on a case by case basis. MONARC wants to provide a forum for the discussion of how these centres will get started and develop and can play the role of facilitator of the effort to locate candidate centres and bring them into the discussion.
The report describes the services that we believe that CERN will supply
to LHC data analysis, based on the physics requirements. These include:
CERN will have the original or master copy of the following data:
The regional centres will provide:
Support is called out as a key element in achieving the smooth functioning of this distributed architecture. It is essential for the regional centre to provide a critical mass of user support. It is also noted that since this is a commitment that extends over a long period of time, long term staffing, a budget for hardware evolution, and support for R&D into new technologies must be provided.
Work on this report is just beginning. It will include a study of BaBar at SLAC, CDF and D0 'Run II' at Fermilab, COMPASS at CERN, and the STAR experiment at RHIC. The approach will be to survey the available public literature on these experiments and to abstract information that is particularly relevant to LHC computing. This can be supplemented where required by discussions with leaders of the computing and analysis efforts.There will not be an attempt to create complete, self-contained expositions of how each experiment does all its tasks. We will have a 'contact-person' for each experiment who will be responsible for gathering the material and summarising it for the report. Most of these 'contact-persons' are now in place. There will be an overall editor for the final report.
On April 13, there was a meeting of representatives of potential Regional Centre sites. It was felt at this point that we had made good progress in understanding the issues of how Regional Centres could contribute to LHC computing and it was now time to share this with possible candidates, to hear their plans for the future, and to get their feedback on our discussions. The three documents discussed above, which had been made available in advance of the meeting, were summarised briefly. We then heard presentations [6] from IN2P3/France, INFN/Italy, LBNL/US(ATLAS), FNAL/US(CMS), RAL/UK, Germany, KEK/Japan(ATLAS), Russia/Moscow.
The general tone of the meeting was very positive. Some organisations, such as IN2P3, expressed confidence that their current plans and expected funding levels would permit them to serve as Tier1 Regional Centres. Others are involved in developing specific proposals that can be put before their national funding agencies within the next few months or a year. Still others have recently begun discussions within their High Energy Physics community as a first step in formulating their plans. In general, the representatives indicated that their funding agencies understood the scale of the LHC analysis problem and accepted the idea that significant resources outside of CERN would need to be provided. We can conclude from the meeting that there are several candidates for Regional Centres that have a good chance to get support to proceed and will be at a scale roughly equivalent to MONARC's profile of a Tier1 RC. It was also clear that there would be several styles of implementation of the Regional Centre concept. One variation is that several centres saw themselves serving all four major LHC experiments but others, especially in the US and Japan, will serve only single experiments. Another variation is that some Tier1 Regional Centres will be located at a single site while others may be somewhat distributed themselves although presumably quite highly integrated.
MONARC expects to follow up this first meeting with another meeting towards the end of 1999. We will have a draft of the final document on Regional Centres available before the meeting for comment by the Regional Centres' representatives. In addition to hearing plans, status reports and updates, we hope to have discussion on the interaction between the Regional Centres and CERN and between the Centres and their constituents. We also plan to be able to present to the Regional Centres representatives MONARC results which may help them develop their strategies.
The main initiative in technology tracking was to take advantage of CERN IT efforts in this area. We heard a report on the evolution of CPU costs by Sverre Jarp of CERN who serves on a group called PASTA which is tracking processor and storage technologies [7]. We look forward to additional such presentations in the future.
mid-July | Complete the Report on Computing Architectures of Future Experiments |
end-'99 | Produce the final document on the Regional Centres |
end-'99 | Consider the strategic objectives of MONARC modelling� |
end-'99 | Develop cost evolution model for networking |
end-'99 | Develop cost evolution model for CPU, disk and mass storage systems |
�In a first phase it is important that the Simulation and Analysis WGs develop confidence in the detailed validity of the MONARC simulation tools on small systems with all activities under our control. This means convincing ourselves, and others, that we really have produced working models of the distributed computing process. In parallel, or as soon as possible afterwards, the Architecture WG should consider the "in the large" issues that MONARC needs to model. For example, how will priorities be determined between large-scale production jobs, group analysis and work by individuals? What commitments will CERN and the Tier 1 Regional Centres need to make with each other?
The task of the Analysis Process Design Working Group was to develop a preliminary, but nevertheless feasible, design of the Analysis Process in the LHC era.
The principal reults obtained are presented below, following the organisation of the PEP subtasks. Further details may be found on the Analysis Process Design Working Group's Web page[8].
The "user-requirements" approach has contributed most to the generation of the first Analysis Process scenarios for LHC experiments to go into the MONARC simulation in Phase 1.
Limited studies of scenarios heavily influenced by available resources have been performed. More detailed studies will be undertaken as we receive feedback from Simulation and Architecture WGs.
The first approximation to parameters of the Analysis Process scenarios, their values, ranges and later distributions will be refined through successive iterations of simulation and progressively more detailed configurations of resources.
A survey of the Analysis Processes of experiments taking data now and in the next three years was performed (Phase 1B, subtask 4.4.1). Inspection of experiments at LEP and at FNAL (including RUN-II) revealed methodologies highly tuned to their physics channels, backgrounds, and detector performances which employ mature technologies for most of their installed computing resources [9].
The dimension of the computing resources needed, the dispersion and number of the analysing physicists, and mainly the distributed approach to the analysis, set a scale for technology and architectures which requires a distributed and coherent design from the beginning of LHC era.
Although we may be guided by past and present experience, particularly for the way an individual physicist user needs access to the relevant data during analysis, there is evidence that the techniques used cannot easily scale to LHC.
Our survey showed that a new approach to the Analysis Process for LHC is needed in order to cope with the size, constraints and distributed requirements of the future experiments.
Following the "user-requirements" approach, we considered the specific physics goals at LHC, with the anticipated trigger, signal and background rates and the data volume to be recorded and analysed. Thus there is a firm basis in the anticipated LHC physics for the initial parameters and distributions used to design our Analysis Processes.
We concluded that some hierarchy has to be built into the Analysis Process from the beginning. Our model is that the experiment(s) define "official" Physics Analysis Groups (PAG), developing algorithms, refining calibrations and studying particular channels. We start with each PAG requiring access to a subset of the order of a few percent of the accumulated experimental data (109 events per year at full Luminosity). The Analysis Process follows the hierarchy: Experiment-> Analysis Groups-> Individuals. Coordination between the PAGs and between the Individual physicists is needed; the logical and physical overlap in data sample storage, event selection and trigger specification is most relevant for our studies.
An Analysis Group will have about 25 active physicists, spread in
different (and perhaps overlapping) World Regions. Table 4 gives a summary of the
"Group approach" to the Analysis Process.
LHC Experiments |
Value | Range |
# of analyses WG | 20/Exp. | 10-25/Exp. |
# of Members of WG | 25 | 15-35 |
# of RCs (including CERN) | 8/Exp. | 4-12/Exp. |
# of Analyses /RC | 5 | 3-7 |
Active time of Members | 8 Hour/Day | 2-14 Hour/Day |
Activity of Members | Single RC | More than one RC |
The above considerations lead to a Group approach for the reduction of the data-sample
(using a common facility) and to a local (Regional Centre) approach for individual
activities[10][11].
The possible initial phases of the Analysis process were investigated and some preliminary data sets accessed during the various steps were defined (Phase 1B, subtask 4.4.2). Given the Group/Individual Model above described, the analysis process can be represented as in the following scheme:
The Analysis steps therefore are:
The following diagram shows one of the possible implementations of the Analysis Model. The initial CTP differences between ATLAS and CMS are here expressed as an example of how the "Selection Pass" can lead to quite different Models and therefore to a spread of architectures for Analysis Design.
The identification of a first Analysis Model for LHC
experiment was performed in order to provide input for simulation (Phase 1B, subtask
4.4.3). The architecture has been designed taking into account the many parameters and the
constraints for the steps of the analysis, some of them being reported in the following
table:
Parameter | Value | Range |
Frequency | 4/ Year | 2-6/ Year |
Input Data | 1 PB | 0.5-2 PB |
CPU/event | 350 SI95.Sec | 250-500 SI95.Sec |
Data Input Storage | Tape (HPSS?) | Disk-Tape |
Output Data | 0.1 PB | 0.05-0.2 PB |
Data Output Storage | Disk | Disk-Tape |
Triggered by | Collaboration | 1/2 Collab. - 1/2 Anal. WGs |
Data Input Residence | CERN | CERN + some RC |
Data Output Residence | CERN + some RC | CERN + RCs |
Time response | 1 Month | 10 Days - 2 Months |
Priority (if possible) | High | - |
Parameter | Value | Range |
Frequency | 1/ Month | 0.5 - 4.0 / Month |
Input Data | 100 TB | 20-500 TB |
CPU/event | 0.25 SI95.Sec | 0.10 - 0.50 SI95.Sec |
Triggered by | WGs | - |
Data Input Storage | Disk | 1/2 Disk - 1/2 Tape |
Output Data | 1 TB | 0.5 - 10 TB |
Data Output Storage | Disk | Disk and Tape |
Data Output Residence | RCs | Specific RC + Other RCs |
Time response | 3 Days | 1 Day - 7 Days |
Parameter | Value | Range |
Frequency | 1/Month | 0.5 - 4.0 / Month |
Input Data | Output of Pass 1 | |
CPU/event | 2.5 SI95.Sec | 1.0 -5.0 SI95.Sec |
CPU Residence | RC | RC + Desktops? |
Triggered by | WG | - |
Output Data | 0.1 TB | 0.05 -1.0 TB |
Data Output Storage | Disk | Disk |
Time response | 1 Day | 0.5 - 3 Days |
Note: Desktop = Institute resources |
Parameter | Value | Range |
Frequency | 4/Day | 2 - 8 /Day |
CPU/event | 3.0 SI95.Sec | 1.5 -5.0 SI95.Sec |
Triggered by | User | 1/3 WG - 2/3 Users |
Time response | 4 Hours | 2 - 8 Hours |
The most relevant parameters are:
Some of the ranges and eventually some of the possible combination of them can lead to
unfeasible models, either in terms of required resources or in terms of turnaround
responsiveness. Studies where performed to establish constraints on the parameters to
avoid unfeasible approaches [14]. For example some of the proposed time responses for a
given Analysis may lead to required resources (either CPU power or data storage) that
remains "idle" for the most of the time. This is a clear indication of an
unfeasable Model. Another example might be a Model that meets the requests of the expected
Analysis needs, but cannot be afforded because of the too high Network data transfer (note
that it's not the bandwidth the only parameter, being also the latency and the round trip
times critical for database transactions).
The task aimed to establish how the different schemes of access to the
collaboration resources could be mapped into the analysis jobs needs. (Phase 1B-1C,
subtask 4.4.4).
Implementing priorities, schedules and policies in a distributed Analysis approach should
include them directly into the architecture. Performing the Analysis at LHC in an
hierarchical Experiment -> Group -> Individual implementation is a starting point.
As already said in other parts of the Progress Report, there is also the need for a
definition of rates and percentages of accesses to the hierarchy of data (TAG -> AOD
-> ESD -> RAW) for any of the Analysis steps. Having understood that criteria and
priorities (or having a priori defined them because of resources constraints),
can be explicitly implemented into different Models in order to evaluate performances and
costs.
The task is till under development and in particular what is needed for the first delivery
is the identification of possible resource architectures and the mapping of the data and
job analysis into them.
Establishing a preliminary set of parameters for the evaluation of the
models simulated is the first goal of this task (Phase 1B-1C, subtask 4.4.5). The process
is under way, the major issue being the identification of clear, even if preliminary,
parameters that can classify the models into the planned resources. Some propositions have
been advanced, like obvious parameters such as occupancy of CPUs, of storage, of network,
etc., and less obvious parameters like number of Regional Centres, network use, management
of the system, coordination etc. [15]. The global cost of a given Analysis Model is one of
the major elements for the evaluation and it requires a careful inspection of the
techologies trends by the Technology Tracking Group in order to produce prices scales.
Another very important key parameter is the isolation, via the simulation, of possible
bottlenecks of the architecture/infrastructure of the RC models. Moreover there are also
some parameters that can only be evaluated taking into account the whole Computing System
Design, like the ability to respond in due time to an "urgent", medium
complexity, analysis.
More informations about this important deliverable can be found also in Chapter 6.
During the current Phase 1C and the next Phase 2 of the PEP there will
be activity on a large number of issues, some covering both phases and some only foreseen
for the last phase. What follows here is a short list of them.
The aim of the Testbed Working Group is to provide the measurements of some of the key system parameters which govern the behaviour and the scalability of the various models of the distributed computing system. The measurements have to implement the "use-cases" of the data analysis models and the data distribution models which are defined by the Architecture Working Group and the Analysis Process Design Working Group. The result of the measurements will then be fed back to the Simulation Working Group to check the validity of the simulation models and the selection of the key parameters.
A simple computing and network architecture was implemented by the end of January '99 (a month later than foreseen), then many more sites followed to set up the machines devoted to the measurements in February. Resources devoted to these measurements at CERN as a "central facility" were delivered at the beginning of April.
In parallel, a suitable set of test applications was identified. Actual measurements were started in April '99 and first preliminary results were obtained at the beginning of May '99. Implications of the results are now being discussed within the group, in conjunction with the Simulation Working Group.
In the meantime, up-to-date information about the performance of Objectivity/DB has been collected, mainly from RD45, BaBar and GIOD. Recommendations for our test environments have been defined accordingly:
To study the distributed aspect of object database such as database replication, the following list of basic software combinations has been selected as a reference environment of the testbed:
In addition to the above list, other platforms used in the study includes Intel PC's running Windows NT v. 4, with Visual C++ v. 5.0, and Linux.
For the "use-cases" software and the data modelling, the following set of applications have been identified as suitable for studying various system parameters. In fact, some of them are already used in other Objectivity/DB benchmark measurements. These applications have been tailored and tuned to reflect the various data models of our interests.
The group plans to involve all the participating sites with the above environments to test the performance of globally distributed databases. A dedicated facility at CERN has been set up with the required software. In addition, the following facilities are now available as the testing environments.
CERN | SUN Enterprise 450 (4*400MHz CPUs, 512MB memory, 4
UltraSCSI channels, 10*18G disks) Use of mass storage management (HPSS) facility is being planned. |
Caltech | HP Exemplar SPP 2000 (256 CPUs, 64 GByte memory) HPSS (600 TB tape + 500 GB disk cache) HP Kayak PC (450 MHz, 128 MB memory, 20 GB disk, ATM) HP C200 (200 MHz CPU, 128 MB memory, 10 GB disk) Sun SparcStation 20 (80 GB disk) Sun Enterprise 250 (dual 450Mhz CPUs, 256 MB memory�) Micron Millenia PC (450 MHz CPU, 128 MB memory, 20 GBytes disk) ~1 TB RAID FibreChannel disk (to be attached to the Enterprise 250�) � shortly to be ordered |
CNAF | SUN UltraSparc 5, 18 GB disk |
FNAL | ES450 Sun Server (dual CPUs), 100 GB disk + access to a STK Silo |
Genova | SUN UltraSparc 5, 18 GB disk |
KEK | SUN UltraSparc, 100 GB disk |
Milano | SUN UltraSparc 5, 18 GB disk Access to non dedicated facilities is available at CILEA: to a SUN system similar to the dedicated one and to the HP Exemplar SPP 2000 of the Centre, for agreed tests. |
Padova | SUN UltraSparc 5, 117 GB disk + SUN Sparc 20, 20 GB disk |
Roma | SUN UltraSparc 5, 27 GB disk |
Tufts | Pentium II 300 MHz PC, 12 GB disk (+ Pentium-II 400 MHz PC, 22 GB disk, in July) |
A network test topology, giving access to the network advanced services, is being set up on the layout provided by the Italian project Garr-it2. For the network connectivity at Caltech, NTON (OC12->OC48), CalREN-2 (OC12), CalREN-2 ATM (OC12) and ESnet (T1) will be utilized. A link between KEK and CERN will be a public link of NACSIS 2 Mbps line as well as a dedicated 2 Mbps satellite ATM virtual link of Japan-Europe Gamma project.
The set of measurements to be carried out in the Testbed WG has been defined in agreement with the other working groups, and particularly with the Simulation WG, as described in Section 2.5. The behaviour of the database server needed to be defined with a response time function for read and write transactions to the database.
The response time function is a combination of various transaction overheads, which are internal to the database software, and the CPU speed and the data transfer speed, which will vary from system to system. It also depends on the job load as number of jobs increase on the system.
A set of measurements have been performed using the ported ATLFAST++ program with a local federation [20]. A total number of 100000 events (~4 GB) are stored on a SUN UltraSparc 5 workstation . The measurements are made on:
Preliminary results are obtained from these tests and the the group is now trying to understand the results to give feedback to the Simulation Woking Group.
In the stress test, the program read both Tag and Event attributes from the same Objectivity containers with a small amount of CPU cycle used in the analysis program. A linear dependence of the execution time on the number of concurrent jobs is shown until a divergent behaviour starts. By tuning the cache size of the Objectivity client, the divergency disappears and the system behaves linearly up to 60 or so concurrent jobs on SUN Ultra 5 with 128 MBytes of memory. The cause of the divergent behaviour in the initial cache size is now being investigated, but the system is proven to behave linearly for a reasonable number of concurrent jobs.
In the timing tests, CPU time and the wall clock execution time for a single job have been measured. The CPU time per MBytes read is the same for sequential and non-sequential data access, which is consistent with the previous study of the CPU requirements of database I/O transaction[21]. The wall-clock execution time of the job for reading selected event sample is slower than the sequential reading, which suggests an additional overhead in data I/O or in database transaction. For reading a half of the event sample in the database, wall-clock time differens is about 80 seconds per 50,000 events. This study will give us the knowledge of the impact on system performance due to efficient or inefficient use of data modelling and access patterns. The exact cause of the wall-clock time overhead is now being investigated.
In another set of tests using the ATLAS 1TB milestone data model, a performance of the client-server configuration of Objectivity has been measured[22]. A preliminary study of the result suggests that the number of concurrent jobs and the use of client-server configuration changes the behaviour of the system from CPU-bound state to IO-bound state. A set of studies for different hardware configurations and the networks, including the test over WAN is planned.
In parallel to these measurements, previous results (see [21] and references quoted therein) have been analysed and plans of tests are being defined to evaluate how the system performances depend on:
Specific measurements are intended to cross-check simulation results or to parameterize complex system components [23].
In particular, regarding system performances over WAN, advanced network services (like QoS, multicast, etc...) have been investigated [24], mainly with respect to:
Further studies are planned to better understand better how the system performance depends on global parameters, the data server configuration and the data model (see 2.4.1). Local tests will be repeated using AMS, to the extent it could be useful with the present version of AMS: indeed the next version will be multi-threaded and thus some relevant performance figures are expected to change, especially for concurrent access.
We also plan to identify and list the key parameters which are internal to the Objectivity performance tuning, which will give a universal guideline for all testbed measurements on Objectivity.
A thorough comparison of access to local and remote data is also needed, in order to parameterise the network effect on system performances suitably.
Tests on data replication over several distributed federations world-wide are being planned to measure the feasibility of two major tasks: distribution of data produced centrally (like calibrations) and centralization of data generated remotely (like MC events).
Furthermore, we plan to set up a "use-case" where a number of different "virtual" users will access the same event sample (i.e. 100000 events) and will perform concurrently their own analysis on personal collections of events or on Generic Tags in which they can save the main attributes used in their analysis. They will also have the possibility of reclustering the events according to specific criteria and performing their analysis on the re-clustered samples. This test will give some hints on the most effective ways of working for the end-user (less time consuming, more performing).
Regarding the quality of the network services, the aim is to define a set of minimal/critical requirements and extend the test network to the European Quantum experimental layout, to the NACIS and Japan-Europe Gamma networks layout, and to the ESnet layout.
We review in this chapter the planning, resources and schedule of the project as detailed in the PEP. The status described is as of the end of May'99.
The working groups have met regularly, with the Architecture WG meeting every 2 weeks, and the others according to demand. In the last 2 months the Simulation and Analysis WGs have had joint meetings. In addition general meetings have been held, with good participation, at a frequency of about 2 every 3 months. For all meetings video-conferencing has been used. Thus overall we have managed to overcome the problem of widely distributed human resources. Before mid-January 2 meetings with RD45 were held, and we continue a close collaboration.
Overall there has been a broad participation from the MONARC members, and indeed the collaboration has grown in the past months.
A good amount of work was accomplished in the 2 months prior to the official LCB approval in December 1998. However various delays have resulted in a month shift in the timescales set out in the PEP.
The Main Milestones set in the PEP till May were:
December '98 | Choose modelling tools |
December '98 | Hardware setup for testbed systems |
January '99 | Validate the chosen tools with a Model taken from an existing experiment |
March '99 | Complete the first technical run of Simulations of a well defined LHC-type Model� |
March '99 | Start measurements on testbed systems |
April '99 | Choose the range of models to be simulated |
�Here the meaning of the word "technical" is that the simulation is required to run with all the main ingredients needed for simulating an LHC Model; but the first realistic models were not scheduled for this time.
Allowing for the overall delay of a month all of these milestones have been fulfilled, except for that of 'model validation'. This has been due both to the limitations of manpower for modelling, and the fact that we have revised our ideas on the most effective way to validate the modelling tool. We intend now to perform the validation, which we regard as being extremely important, in close collaboration with the MONARC Testbeds WG.
Also for the Architecture WG the internal milestones were revised following the advice of the LCB. Consequently the group has given priority to the task of developing architectures for LHC, and developing guidelines for Regional Centres. Thus the 'Survey of existing experiments' has been completed just recently, and the 'Report on near future experiments' will be restricted in scope, and is due in mid-July.
The next main milestone, which will complete Phase 1, is in July 99.
July '99 | Completion of the first cycle of simulation of possible Model for LHC experiments. First classification of the Models and first evaluation criteria. |
We believe we will be in time for completion of this milestone.
The completion of Phase 1 requires:
It is clear that already at this stage the project has started requiring
a much closer interaction between the WG's; the above summary about Phase 1 completion
already makes this point quite evident.
The steering group mandate encompasses the coordination of the work between the WG's and
this task is going to be crucial in the next months. Some reorganisation of the WG
structure and individual mandates in MONARC could be decided for the next stage, if it
will be deemed useful.
The Workplan for Phase 2 will be discussed in Section 6.3 and new more specific Milestones will be set there.
The external projects with whom we have working relations were listed in
Section 3.2 of the PEP. We repeat this list here with supporting comments.
The measurements and the tests performed in the contest of the Testbed WG should however
be well suited also for assessing different fall-back solutions if they are of interest
for any of the experiments participating in MONARC.
The hardware resources promised for the setting up of the Testbeds have been granted and are now in use (see Chapter 5). As for manpower, the hiring of people has taken place not only in CERN, but also in Milan (INFN/CILEA, from January 99), and in Tufts (in May 99). People with previous experience in related computing matters have joined the project (from computing teams, services and centres), as well as new young people (some having previously worked on physics analysis) willing to acquire an experience in such matters (e.g. in Bologna ). The CERN team fully devoted to MONARC, that consisted only of Iosif Legrand, has recently acquired the valuable contribution of Youhei Morita. The MONARC project is seen as strategic and the prospects of getting new people for working in it seem good in various countries (e.g. in Italy and in the US).
The next section sketches some ideas of importance for Phase 2. The following 6.3 will give the lines for a workplan till end-99 with the relevant main milestones.
Starting this Summer, based on the experience gained from the study and simulation of the Models developed up until that time, a systematic top-down specific of the overall system should be performed. This will involve detailed choices of a range of parameters characterising the site architectures (computing capacity, internal channel I/Os, LAN speeds), the Analysis Processes, and the network loads resulting from users' activities other than event data analysis. This design specification should possibly include
The more complex decisions implied by the above set of design specifications and concepts could lead to long and complex (multi-step) decision processes that should be the subject of careful, and potentially protracted study (see Chapter 7). In order to keep to the defined scope and schedule of MONARC as approved (for Phases 1 and 2 of the project), the overall system capacity and/or network speeds should be allowed to vary over a considerable range, so that the majority of the workload may be satisfied with acceptable turnaround times. These may be minutes for interactive queries, hours for short jobs, a day for most long jobs, and few days for the entire workload. In this way, by the end of Phase 2, critical baseline resource requirements may be determined (in first approximation) and peculiarities or flaws in certain types of "Analysis Process" may be isolated.
Some of the tools to be designed and/or simulated, that would enable the above goals during phase 2, or eventually phase 3, are
The main, general milestones for Phase2, as set out in the PEP were:
August '99 | Completion of the coding and validating phase for second-round Models |
November '99 | Completion of the second cycle of simulations of refined Models for LHC experiments |
December '99 | Completion of the project and delivery of the deliverables. |
The goals to be reached by end-99 (set of "baseline" models, guidelines both for model building and for Regional Centres) were set with a timing based on the need for MONARC to provide a useful contribution to the Computing Progress Reports of ATLAS and CMS (expected end-99 too). As it appears also from the previous section 6.2, a high level of detail will have finally to be taken into account in a realistic implementation oriented model.
The minimal scope of Phase 2 is the iteration of at least a couple of
simulation cycles after the first one, in order to acquire expertise on the sensitivity of
the models to the different features and parameters; at the same time incorporating a
first definition of the "cost metrics".
Issues like the study of detailed priority schemes, of data caching and tape
"staging", as well as job-migration vs network data transfer will enhance the
value of the MONARC contribution to the CPR's but are not required for this contribution
being useful and significant.
The planning made here assumes Phase 2 simulations to end on November 99. If the CPR's are delayed MONARC will surely be able to take advantage of the added time for addressing the issues of section 6.2 that cannot be considered in the shorter schedule.
The Phase 3 as it was foreseen in the PEP was centered on prototyping and implementation issues; it is now clear that in the first stage of Phase 3, the core of the work will be devoted to system optimisation studies (see Chapter 7). The boundary Phase 2-3 is thus for MONARC largely a matter of external opportunity.
It is proposed to link the end of Phase 2 to the CPR date. If a Phase 3 is approved, the end of Phase 2 will coincide with the CPR completion date, and Phase 3 will address spreading the modelling knowledge (code, guidelines, etc.) into the experiments. In absence of Phase 3, Phase 2 should include an organised knowledge transfer to the experiments and should therefore end some two months after the CPR completion.
As said above, this section deal with a time span for simulation ending
in November 99.
The following results need to be achieved with such timing:
This is a crucial point as we cannot expect to be able to forecast technologies,costs and
resources on the full time span of LHC life; actually even 5 years are a difficult time
span.
The timing of Phase 2 after end-99 will depend both on the timing of the CPRs and on the decisions about Phase 3, as stated above. The planning for a possible Phase 2 extension and operational proposals for a Phase 3 extension will be presented to the December LCB. The final status report of MONARC Phase 2 could also be presented at this time, or a few months later, according to the timing of the CPRs.
The main MONARC milestones till end-99 are:
July '99 | Completion of the first cycle of simulation of possible Model for LHC experiments. First classification of the Models and first evaluation criteria. |
September '99 | Reliable figures on Technologies and Costs from Technology Tracking work to be inserted in the Modelling. |
September '99 | First results on Model Validation available. |
September '99 | First results on Model Comparison available. |
November '99 | Completion of a simulation cycle achieving the goals described in 6.3.3 |
November '99 | Document on Guidelines for Regional Centres available |
December '99 | Presentation to LCB of a proposal for the continuation of MONARC |
We believe that from 2000 onwards, a significant amount of work will be necessary to model, prototype and optimise the design of the overall distributed computing and data handling systems for the LHC experiments. This work, much of which should be done in common for the experiments, would be aimed at providing "cost effective" means of doing data analysis in the various world regions, as well as at CERN. Finding common solutions would save some of the resources devoted to determining the solutions, and would ensure that the solutions found were mutually compatible. The importance of compatibility based on common solutions applies as much to cases where multiple Regional Centres in a country intercommunicate across a common network infrastructure, as it does to sites (including CERN) that serve more than one LHC experiment.
A MONARC Phase 3 could have a useful impact in several areas, including:
Details on the synergy between a MONARC Phase 3 and R&D projects such as the recently approved Next Generation Internet "Particle Physics Data Grid" (PPDG) may be found in [25]. The PPDG project (involving ANL, BNL, Caltech, FNAL, JLAB, LBNL, SDSC, SLAC, and the University of Wisconsin) shares MONARC's aim of finding common solutions to meet the large-scale data management needs of high energy (as well as nuclear) physics. Some of the concepts of a possible Phase 3 study are briefly summarized below.
The Phase 3 study could be aimed at maximizing the workload sustainable
by a given set of networks and site facilities, or at reducing the long turnaround times
for certain data analysis tasks, or a combination of both. Unlike Phase 2, the
optimization of the system in Phase 3 would no longer exclude long and involved decision
processes, as the potential gains in terms of work accomplished or resources saved could
be large. Some examples of the complex elements of the Computing Model that might
determine the (realistic) behavior of the overall system, and which could be studied in
Phase 3 are
MONARC in Phase 3 could exploit the studies, system software developments, and prototype system tests completed by early 2000, to develop more sophisticated and efficient Models than were possible in Phase 2. The Simulation and Modelling work of MONARC on data-intensive distributed systems is likely to be more advanced than in PPDG or other NGI projects in 2000, so that MONARC Phase 3 could have a central role in the further study and advancement of the design of distributed systems capable of PetaByte-scale data processing and analysis. As mentioned in the PEP, this activity would potentially be of great importance not only for the LHC experiments, but for scientific research on a broader front, and eventually for industry.
Two example models have been built. RECONSTRUCTION is done in a single
Regional Centre, it requires access to a large amount of data and
significant processing power. Multiple AMS servers, hundreds of CPU nodes, each with its
own memory, are the elements of this model. Several JOBS have been created to reconstruct
data and create new data types (RAW->ESD, ESD->AOD, AOD->TAG). With the realistic
description of LAN and the AMS interactions, the model seems to have all the required
components.
The PHYSICS ANALYSIS model is built of multiple Regional Centres, each
with independent hardware configuration, LAN and WAN characteristics, with possibly
different data available and each with different set of analysis jobs which can be run.
1) The WWW Home Page for the MONARC
Project
http://www.cern.ch/MONARC/
2) The MONARC Project
Execution Plan, September 1998
http://www.cern.ch/MONARC/docs/pep.html
3) Rough
Sizing Estimates for a Computing Facility for a Large LHC experiment, Les Robertson.
MONARC-99/1.
http://nicewww.cern.ch/~les/monarc/capacity_summary.html.
4) Report on
Computing Architectures of Existing Experiments, V.O'Dell et al. MONARC-99/2.
http://home.fnal.gov/~odell/monarc_report.html
5) Regional
Centers for LHC Computing, Luciano Barone et al. MONARC-99/3. (text version)
http://home.cern.ch/~barone/monarc/RCArchitecture.html
6) Presentations and
notes from the MONARC meeting with Regional Center Representatives April 23, 1999
http://www.fnal.gov/projects/monarc/task2/rc_mtg_apr_23_99.html
7) PASTA,
Technology Tracking Team for Processors, Memory, Storage and Architectures:
http://nicewww.cern.ch/~les/pasta/run2/welcome.html
8) Home
page of the Analysis Design Working Group:
http://www.bo.infn.it/monarc/ADWG/AD-WG-Webpage.html
9) Analysis Processes of
current and imminent experiments:
http://www.bo.infn.it/monarc/ADWG/Meetings/Docu-15-12-98.html
10) Monarc Note
98/1:
http://www.mi.infn.it/~cmp/rd55/rd55-1-98.html
11) CMS TN-1996/071 The CMS Computing Model
12) Analysis
Model diagrams:
http://www.bo.infn.it/monarc/ADWG/Meetings/15-01-99-Docu/Monarc-AD-WG-0199_2.ppt
13) Parameters
of the initial Analysis Model:
http://www.bo.infn.it/monarc/ADWG/Meetings/15-01-99-Docu/Monarc-AD-WG-0199.html
14) Unfeasable models
evaluations:
http://www.bo.infn.it/monarc/ADWG/Meetings/Docu-24-01-99.html (to be released)
15) Preliminary
evaluation criteria (slide 8)
http://bo_srv1_nice.bo.infn.it/~capiluppi/monarc-workshop-0599.pdf
16) ATLFAST++
in LHC++:
http://www.cern.ch/Atlas/GROUPS/SOFTWARE/OO/domains/analysis/atlfast++.html
17) GIOD
(Globally Interconnected Object Databases) project:
https://julianbunn.org/Default.htm
18) ATLAS 1 TB
Milestone:
http://home.cern.ch/s/schaffer/www/slides/db-meeting-170399-new/
19) CMS test beam activity (???)
20) MONARC-99/4: M.
Boschini, L. Perini, F. Prelz, S. Resconi: Preliminary Objectivity tests for MONARC
project on a local federated database:
http://www.cern.ch/MONARC/plenary/99-05-10/silvia/Welcome.html
21) K.
Holtman: CPU requirements for 100 MB/s writing with Objectivity:
http://home.cern.ch/~kholtman/monarc/cpureqs.html
22) Y. Morita: MONARC
testbed and a preliminary measurement on Objectivity AMS server:
http://www-ccint.kek.jp/People/morita/Monarc/testbed9905/
23) K. Sliwa: What
measurements are needed now?:
http://www.cern.ch/MONARC/simulation/measurements_may_99.htm
24) C.
Vistoli: QoS Tests and relationship with MONARC:
http://www.cnaf.infn.it/~vistoli/monarc/index.htm
25) H.
Newman: Ideas for Collaborative work as a Phase 3 of MONARC
http://www.cern.ch/MONARC/docs/progress_report/longc7.html
26) Christoph von Praun: Modelling and Simulation of Wide Area
Data Communications.
A talk given at the CMS Computing Steering Board on 19/06/98.
27) J.J.Bunn:
Simple Simulation of the Computing Models:
https://julianbunn.org/results/model/model.html
28) The PTOLEMY
Simulation Tool:
http://www-tkn.ee.tu-berlin.de/equipment/sim/ptolemy.html
29) The SES Workbench
http://www.ses.com/Workbench/index.htm
30) PARASOL
- C/C++ simulation library for dist / parallel systems
http://www.hensa.ac.uk/parallel/simulation/architectures/parasol/index.html